DOC Skip to main content

Reference Solution & Best Practice – Mounting (Gemini 215)

Update on 2025-09-15 07:15:33

ON THIS PAGE

Overview

This document provides the optimal reference installation design scheme for cameras, which can assist customers in quickly implementing during the product implementation process.

1. 2D Drawings of Gemini 215

2. Installation and Fixing Methods of Gemini 215

2.1 Option 1. Fix it by using the 1/4-20 UNC hole at the bottom (the hole depth is 5 mm). Torque requirement: 4.0 Nm.

2.2 Option 2. Fix it by using two M3 holes on the back (the hole depth is 3.0 mm). Torque requirement: 0.4 Nm.


[Note]
1. The module needs to be grounded using the 1/4-20 UNC hole.
2. After the module is assembled into the whole device, it must not block the field of view (FOV).

ON THIS PAGE

Add

  • Name:

  • Link Address:

Cancel

Add

  • Name:

  • Link Address:

Cancel
Questions or
Feedback?

Feedback

  • Your feedback matters! Share your thoughts on this page, report errors, or let us know how we can improve to better support your needs. If applicable, please include the specific sentence or section to help us identify and address the issue.